Kier – Wellingborough Prison

With the closure of HMP Wellingborough, demolition began to make way for a new larger and modern facility. As a result of the demolition, a large amount of asbestos was uncovered and because a sizeable scaffold framework was required, we produced a full design for the large areas of framework and encapsulated roof systems so the specialist removal team could remove this harmful substance.